Hvac clean room design, installation and construction process

2023-05-31 10:00:00
Times


Hvac clean room design, installation and construction process


     With the development and progress of science and technology, the production of various sophisticated products has become more and more common, and these products need to be processed in a clean room in the production process to ensure their quality. Therefore, in modern industrial production, the importance of the word "clean" is self-evident. The design and construction process of clean workshop design and installation, also known as HVAC clean room design and installation or clean room clean engineering, has therefore become particularly important.


无尘室洁净工程无尘室洁净工程


The clean room cleaning project is to control particles in the air, and a number of design works must be completed before construction. First of all, we need to check the site. Regardless of the type of clean room, the building in which it is located must be carefully designed and constructed, and inspected in strict accordance with the relevant building codes. Acceptance criteria refer to international standards for cleanliness and clean room safety assessment.


Next, the development of cleanliness specifications is also a very key link. This is a core issue that needs to be considered when designing a clean room, that is, various factors such as the characteristics, needs and specifications of the produced goods, as well as the environmental conditions in which they are located. Only on this basis can we determine the grade of clean room. Usually, these elements are particularly related to the direction of use of the clean room, as well as the use of sophisticated products and other factors.


In the design process, it is necessary to improve the sketch of the design scheme, including the ground view, elevation and section diagram, and determine the design parameters such as cleaning module and filter element scheme. The second is to formulate construction standards and quality standards, manage the construction team and ensure the construction progress and quality. The connection of various parts of the clean room and environmental control also need to be improved in the design and debugging of the scheme.


In the construction, it is necessary to clean the site and transport the finished product first, and then lay the ground according to the plane design, build the wall ceiling, and install the auxiliary facilities. Of course, the expertise and skills of the construction team and related personnel (such as supervisors, engineers, etc.) are also crucial.


The design and construction of clean room cleaning engineering requires fine and comprehensive planning and strict implementation to ensure that the clean room achieves the expected cleanliness and use effect, and thus ensures the improvement of the production quality and technical level of sophisticated products. In the future, with the continuous progress of science and technology, the importance of clean room cleaning projects will become more and more significant. Jiangsu Zhiming HVAC is a collection of central air conditioning engineering, clean room cleaning engineering, high and low voltage power distribution engineering, energy-saving ice storage system engineering, air compressor/industrial pipeline engineering, ventilation and ventilation engineering, insulation engineering, installation, commissioning and maintenance as one of the professional company.